On the outside, we have had eaves installed, cladding fixed to the front of the house and the top metre or so of drainpipes. All of these still need painting before the scaffold can come down and we can get the final bit of roofing done.
Facade nearly complete |
Scaffolding goes straight through the entry roof |
On the inside, we've had heating and cooling installed, solar panel fixed, cabling and plumbing done, and insulation in the roof and most walls. The bath and shower bases have also been delivered and set in place, and the frame for the cavity sliding door has been installed.