Electrical and plumbing fitouts have been done - this includes lights, power data and tv points, sinks, toilets, taps and showerheads. Only slight problem is they've put a few downlights in the wrong location - we will have 3 batten lights over the kitchen bench so we can put pendants in, and the downlights they have put there should be in the row between the two benches. Should be an easy fix, as they haven't put any holes where they shouldn't, but another thing to add to the list. Sigh.
Kitchen downlights. |
Ensuite plumbing |
They've also completed our robe and cupboard shelving, towel rails, toilet roll holders, door handles, shower screens and mirrors.
Ensuite wir |
Towel rail and reset ensuite door |
And finally, they've started on some of the fix items. The ensuite door has been put on the correct side, although they still need to reset the frame and paint. The missing overhead cupboard doors have been installed. One of the downpipes that was not connected has been redirected to flow into the storm water, and the downpipes have been partially painted.
Overall I'm very happy with progress, as every time we visit (which is usually twice a week), multiple items have been ticked off.
No comments:
Post a Comment